Delta Extra Long Lead | 10 Metre | Khaki

Let your dog roam free, while keeping them secure with this extra long lead. Perfect for recall training!

£19.99

In stock

More about our Delta Extra Long Lead | 10 Metre | Khaki

Description

Made from 8mm rope, this lead is thinner and lighter than our other products, but still super strong!

 

Using our Delta carabiner clips, this lead is great for letting your dog run free, while still keeping them secure. Ideal for walks out in the open or training. Currently available in khaki Green or Black.

You might also like...

£12.99£14.99

Select options This product has multiple variants. The options may be chosen on the product page

£26.00

Select options This product has multiple variants. The options may be chosen on the product page
31
Hugo & Hudson Navy Star Fabric Dog Collar from Catdog Store

10% off

10% off most items on our website

Use code “CATDOG10” at checkout

Excludes: Raw Foods and Beds

( Only available online – Not in store )